Go behind-the-walls with these behind-the-scenes photos
The Lobero Theatre has been dark for one whole month now, and the Schipper Construction crew has been hard at work with demolition. Seats have been removed, the bricks outside the building have been carefully removed and stored for later use, and interior walls are coming down for the (hooray) expanded restrooms.
Ever wondered how much space 680 seat cushions use when stacked? Turns out, they’ll fill an entire U-Haul truck. Check out peeks of original 1924 brick-work and other treasures hiding behind the drywall in these behind-the-scenes photos from June, shot by David Bazemore.